Procedures your team actually follows

Opening and closing, temperature checks, waste and cash logs, equipment care, incidents and production, run the same way on every shift and reported by location. Boards, procedures and runs, on a phone.

How it fits together

Three pieces, one engine

Clean the ice machine and bake a batch of sourdough are the same object with different steps and statuses. Nothing is hard-coded.

01

Board

Owns the status flow and, if you want, the things it is about: fridges, machines, products. Opening & closing, Fridges & freezers, Equipment, Incidents are boards.

02

Procedure

The SOP itself: ordered steps, who does it, when it starts, what counts as a fail and what happens then. Versioned, so old runs keep the steps they were done with.

03

Run

One execution on a phone: step results, photos, temperatures, signatures and timestamps, moving through the board's statuses until it is complete.

Boards

Four kinds of board, every view you need

Pick a kind and the right views come with it. Start from a template or build your own statuses, colours and rules.

Shift routinesTemperature checksWasteCash logCleaningEquipment careIncident trackerBatch productionCoffee barMenu itemsRequestsExpensesProjects

Starter templates. Every step, status and schedule stays editable.

Workflow

Work that moves through statuses: production, requests, approvals, incidents.

Board · timeline · list · table · calendar

Log

Each run is a record, no progression: waste, closeouts, temperature checks.

Table

Routine

Recurring scheduled checks: cleaning, equipment care, opening and closing.

Calendar · list · board

Project

One-off work where the time each stage takes matters: tasks, policy reviews.

Board · timeline · list · table

Waste, maintenance and incidents

Now boards, not separate products

Waste control, maintenance logs and incident reports used to be three apps. They are three boards now, so they share steps, triggers, photos and reports with everything else you run.

Waste control→Waste log board

Waste log board

Log the item, quantity and reason in seconds. Cost comes from the supply product, and the SOP waste report shows it by location, reason and item.

Maintenance logs→Equipment care board

Equipment care board

Machines are items with a serial number and a photo. Daily cleans and weekly inspections run on a schedule; anything marked out of service raises an issue.

Incident reports→Incident tracker board

Incident tracker board

Report what happened with severity and photos, then move it through review to resolved. Every status change is on the run with who and when.

Steps

What a step can ask for

Steps can be required, conditional on an earlier answer, restricted to a job, or marked as evidence. A pre-check block can gate the rest of the run.

Checkbox

Done or not, optionally required

Number with a range

Temperature, weight, count. Out of range fails the run

Choice

Good / Needs attention / Out of service

Photo

One or several, with a minimum

Signature

Drawn on the phone, kept on the run

Timer

A target time and the elapsed time

Scan

A QR or barcode, matched to the item

Instruction

How to do it, with formatting

Critical control point

A fail schedules a recheck and blocks completion until a corrective action is recorded

Triggers

Runs start themselves

You decide when a procedure is due. Fork creates the run, assigns it to a job or to whoever is on shift, and chases it when it is late.

On a schedule

Daily, weekly or monthly at a time, or every N days after the last completion.

When a shift starts or ends

Per location, optionally per job, with an offset. The opener gets the opening checklist.

When another run finishes

Morning bake done? Start "Restock pastry case".

When a date is reached

Use-by dates on items start the check before they lapse.

From a QR code

Every item prints a code. Scan the fridge, start its temp check.

By hand

From the board, the procedure or the item, when something comes up.

What was missed, where, and what it cost

Seven SOP reports by location and period, printable and exportable as PDF, next to your labor and purchasing reports.

OverviewRoutinesWasteCash movementProjectsExpensesStaff
Premium

Run every shift the same way

SOPs are part of Premium, together with courses, policies, contracts and the assistant. $129 per location per month, unlimited employees.

No card needed for the Free plan · 30-day money-back guarantee on paid plans · Cancel anytime